“Let’s move to the cloud” is easy to say and surprisingly easy to get wrong. Teams that simply copy virtual machines into a cloud provider often end up with the same problems they had on-premises — plus a larger monthly bill. Teams that try to rebuild everything at once stall for a year.
A successful migration is a sequence of deliberate, reversible steps. This checklist is the one we use in our On-Premises to Cloud Migration engagements. It applies to both AWS and Azure.

Phase 1: Define why you are migrating
Write down the business drivers before touching any server. Typical drivers are:
- A data center lease or hardware refresh deadline.
- Reducing operational cost and the effort of running infrastructure.
- Scaling for seasonal or unpredictable demand.
- Improving availability and disaster recovery.
- Faster delivery through managed services and automation.
- Security and compliance requirements.
Each driver implies different priorities. A lease deadline favors speed; a cost driver favors right-sizing and modernization; a resilience driver favors multi-zone architecture. Agree on measurable success criteria — for example “exit the data center by Q3 with no more than 15 minutes of downtime per application and a monthly run cost below X”.
Phase 2: Discovery and assessment
You cannot migrate what you do not understand. Build an inventory that covers:
- Servers and VMs: CPU, memory, storage, utilization over at least two to four weeks, operating system and versions.
- Applications: owners, business criticality, dependencies, licensing, support status.
- Data: databases, file shares, sizes, growth rates, retention and residency requirements.
- Network: inbound and outbound flows, firewall rules, DNS, certificates, VPNs and partner connections.
- Operations: backup, monitoring, patching, scheduled jobs and runbooks.
Dependency mapping is the step most often skipped and the one that most often causes outages. An application that “only” talks to its database may also read a file share, call an internal licensing server and send email through an on-premises relay.
Phase 3: Choose a strategy per workload (the 6 Rs)
| Strategy | What it means | When to use it |
|---|---|---|
| Rehost (“lift and shift”) | Move VMs as they are | Tight deadlines, stable apps, quick wins |
| Replatform (“lift and reshape”) | Small changes, e.g. move a database to a managed service | Reduce operations effort with low risk |
| Refactor / re-architect | Redesign for cloud-native services | Core systems needing scale, agility or resilience |
| Repurchase | Replace with SaaS | Commodity systems such as email, CRM, HR |
| Retire | Switch off | Unused or duplicated applications |
| Retain | Keep on-premises for now | Latency, regulation or hardware constraints |
Most portfolios end up with a mix. A common pattern is to rehost or replatform quickly to meet a deadline, then refactor the few systems where cloud-native design brings real value. Cloud native has many advantages, but it isn’t always the right choice — sometimes a well-run virtual machine is the most economical answer.
Phase 4: Build the landing zone
Before the first workload moves, build the foundation:
- Account / subscription structure separating production, non-production and shared services.
- Identity: central identity provider, single sign-on, MFA, role-based access and break-glass accounts.
- Networking: hub-and-spoke or equivalent topology, private connectivity to your offices or data center, DNS strategy, IP address plan with no overlaps.
- Security baseline: encryption defaults, logging to a central workspace, policy guardrails, vulnerability scanning and key management.
- Governance: tagging standards (owner, cost center, environment), budgets and cost alerts.
- Infrastructure as Code: define everything in templates so environments are reproducible and reviewable.
Phase 5: Plan the data migration
Data is usually the hardest part. Choose a method per data set:
- Offline transfer for very large, static data.
- Online bulk copy followed by incremental sync for file shares.
- Database replication (native replication or migration services) to keep the target in sync until cutover, minimizing downtime.
- Backup and restore for small databases where a maintenance window is acceptable.
Validate row counts, checksums and application-level behavior after each transfer. Plan for character sets, time zones, collation differences and large objects.
Phase 6: Migrate in waves
Group applications into waves based on dependencies and risk:
- Pilot wave: one or two low-risk applications to validate tooling, runbooks and the landing zone.
- Early waves: non-critical applications with few dependencies.
- Core waves: business-critical systems, migrated with rehearsed runbooks.
- Tail: complex legacy systems, sometimes retained or modernized separately.
For every application, write a cutover runbook with a timeline, owners, validation tests, a go/no-go checkpoint and a tested rollback plan. Rehearse the cutover at least once in a non-production environment.
Phase 7: Cutover and hypercare
- Lower DNS TTLs days in advance.
- Freeze changes during the window.
- Run smoke tests and business validation immediately after cutover.
- Keep the on-premises environment available until the rollback window closes.
- Staff a hypercare period with heightened monitoring for one to two weeks.
Phase 8: Optimize after you land
Migration day is the beginning, not the end:
- Right-size resources using real cloud metrics.
- Schedule non-production environments to shut down outside working hours.
- Use reserved capacity or savings plans for steady workloads.
- Move to managed services where they reduce effort.
- Revisit high availability and disaster recovery using multiple availability zones and, where justified, regions.
Our article on cloud cost optimization covers these levers in depth.
The most common migration mistakes
- Skipping dependency mapping and discovering hidden connections during cutover.
- Sizing by allocated rather than used capacity.
- No landing zone, leading to inconsistent security and untraceable costs.
- Underestimating data transfer time and bandwidth.
- No rollback plan.
- Treating the migration as an infrastructure project only — application owners must be involved.
- Forgetting licensing implications for operating systems and databases.
Downloadable summary checklist
- ☐ Business drivers and success criteria agreed
- ☐ Complete inventory with utilization and dependencies
- ☐ Strategy (6 Rs) chosen per workload
- ☐ Landing zone built with identity, network, security and tagging
- ☐ Data migration method chosen and tested
- ☐ Waves planned; pilot completed
- ☐ Runbooks with rollback rehearsed
- ☐ Hypercare staffed
- ☐ Post-migration optimization scheduled
Conclusion
A good migration plan reduces risk, keeps downtime minimal and sets you up to benefit from the cloud rather than simply paying for it. If you want a second pair of eyes on your plan — or help executing it — book a free consultation. We can analyze your existing workload, stack and footprint to create a migration plan and help you execute it.